| - | Features |
|---|---|
| #1 | 20 minute working time allows adequate placement and finishing |
| #2 | Can be mixed to a flowable, plastic or fluid consistency |
| #3 | Concrete repair applications highways, bridge decks, grouting, floor leveling, industrial floors, anchoring |
| #4 | Exceeds requirements of ASTM R 928 R3 |